Final Pictures
We still have two gates to install (happening now) but we are pretty much finished. We've been in the house since August 2008 and took around 8 months to complete the landscaping. Since then we've done little additions (the front fence and other things I just don't recall) and 'fixes' that have kept Charles busy. Now what will he do???
Wednesday, December 17, 2008
December 2008
Moving to the front in December with a new driveway. Pavers!
Lots of baserock, and smooth sand.
The grass is doing great and the arbor was finished in November. Only problem we're having is with raccoons going after earthworms.
We'll finish the barbeque in January with a slate slab (actually 2!). We're very close to being 'done'. Expecting to final with the City in late December/early January.
Lots of baserock, and smooth sand.
The grass is doing great and the arbor was finished in November. Only problem we're having is with raccoons going after earthworms.
We'll finish the barbeque in January with a slate slab (actually 2!). We're very close to being 'done'. Expecting to final with the City in late December/early January.
Monday, November 17, 2008
Friday, October 17, 2008
October 2008
Wednesday, September 17, 2008
September 2008
Maxton in his new home - still getting used to it and oh, the noise, noise, noise...
On to the landscaping - first we tear apart the yard...run some gas and electrical lines...and dig a massive water pit in the far corner.
The pit will handle (we hope!) the 100 year rain. 12 X 12 with 18" culverts surrounded by rock and wrapped in fabric. All downspouts head here.
Maxton and heavy equipment!
Tearing it up.
On to the landscaping - first we tear apart the yard...run some gas and electrical lines...and dig a massive water pit in the far corner.
The pit will handle (we hope!) the 100 year rain. 12 X 12 with 18" culverts surrounded by rock and wrapped in fabric. All downspouts head here.
Maxton and heavy equipment!
Tearing it up.
Sunday, August 17, 2008
August 2008
We move in! There are still things to be done but its August and we've sold our house on Elm so in we go to Cordilleras. We're excited and although we're going to have to deal with a lot of dust and dirt for several more months as we shift our focus to landscaping, we're really happy with the outcome of our 'firehouse'.
This is the Dining Room, formerly the Family Room.
The kitchen with our 'monster' island. The island measures 10' X 4'10".
Where we will spend all our time - the Family Room.
This is the Dining Room, formerly the Family Room.
The kitchen with our 'monster' island. The island measures 10' X 4'10".
Where we will spend all our time - the Family Room.
Friday, July 18, 2008
July 2008
We're painting! We're now in the home stretch. Our move-in date is mid-August so we're trying to finish up everything to pass our final inspection and move in according to the City of San Carlos wishes. Might not happen in that order but Kenny and team are working hard to get us there.Oil based paints - not the favorite of Chris and Enrique (painters). Gunky, sticky, and hard to clean up. Cool, white suits though. The garage is full of our appliances. Our Family Room with finished floors, beams and cabinets. Fireplace will be completed before July is out and TV will be installed likely in early August.
This room really turned out nice. The stained glass at the end and the beams really finished it up.
Our stairs. The original plan called for a high wall here with a post to the ceiling. We chose to change it in the field and go with a simple railing to keep the area as open as possible. We like the outcome.
Next set of photos should be for August and the final touches. Then, we get to work on the landscaping...
Our stairs. The original plan called for a high wall here with a post to the ceiling. We chose to change it in the field and go with a simple railing to keep the area as open as possible. We like the outcome.
Next set of photos should be for August and the final touches. Then, we get to work on the landscaping...